Latest Updates On Our Centre of Hope Project

Work at CAPIO Centre of Hope has progressed beyond what was reported in the previous Newsletter. On 22nd July 2020, the staff quarters was officially handed over to the management and 90 staff of Carmelite Prisoners’ Interest Organization. The commissioned building is a one- story building which has 4 flats consisting of three (3) bedrooms each. Through the support of Misean Cara/Irish Aid, the building is equipped with 10KVA Solar power, which was tested by the Executive Direction CAPIO Rev. Father Ambrose Ekeroku, OCD during the handover exercise.
Front view of the Centre of Hope staff quarters
Aerial view of the staff quarters
CAPIO’s Executive Director, Rev. Fr Ambrose Ekeroku (OCD) Testing The Installed Solar Panels
The site Engineer (Lingard), ED and CAPIO staff inspecting the building
Official Handover of Centre of Hope Staff Quarters
Completed 40,000 Liters water Stanchion
Interior and external view of the Poultry building (broiler section)
Interior and external view of the Poultry Building (Layers section)
External view of the Abattoir
Designated poultry processing area inside the Abattoir
Pig processing section inside the Abattoir
External and internal view of the piggery
Fish ponds and back view of farm house
External view of Farm Office and lobby
Brooding and egg store section
Farm Store
Aerial view of Farm Office Building, Poultry (layer and broiler pens), brooding and egg store
Aerial view of Abattoir, Piggery and farm store
Main Entrance to CAPIO Center of Hope
Second entrance to the Centre with security post